Rwanda - Jabana

Power Plant

   |   
  • Jaban Power plant
  • Jabana Power plant
  • Jabana Power plant
  • Jabana Power plant
  • Jaban Power plant
  • Jabana Power plant
  • Jabana Power plant
  • Jabana Power plant
  • Jabana Power plant
  • Jabana Power plant
  • Jabana Power plant
  • Jabana Power plant
  • Jabana Power plant
  • Jaban Power plant

Power Plant

Emergency Power Plant.

Engineering, turnkey supply, erection and commissioning of emergency base load power plant. Entirely air freighted (220 Metric tons),

FAST TRACK PROJECT : Time for completion and start-up ; 3,5 months

Engines: MTU, 6 x 16V4000G21 – 7.800 kWe in total (Site rating 1500m altitude)

Fuel: Diesel oil